Record an inspection result
This guide covers the core inspector flow: recording the outcome of an inspection so the weld’s status reflects what actually happened.
Before you start
Section titled “Before you start”- You need permission to record inspections on the project (ask your admin if Record result doesn’t appear for you).
- Know the ISO and weld number you’re recording a result for — weld numbers repeat across different ISOs, so the ISO is what tells you which weld is actually yours — and whether it already has an open inspection.
Find or start the inspection
Section titled “Find or start the inspection”-
Open Welds and find the weld, then select its Inspections action — or open Inspections from the navigation to see every inspection on the project.
On the Inspections screen each row carries the identifiers you work from: an ISO column (the drawing number, which opens that ISO) and a Weld column (the weld number). The Search ISO, weld, chart… box matches on the ISO drawing number and the weld number as well as an inspection’s chart, tech, and description — so you can type a drawing number or a weld number straight in and get the inspections on it. Search covers every inspection you have access to, not just the page you’re looking at, and the row count reflects everything that matched — it never widens what you can see, so a colleague with different access may get a different count for the same term. Both identifiers are also carried into the screen’s export.
-
If the weld doesn’t have an inspection yet, select New inspection and fill in:
- Inspection type (required)
- NDE contractor (optional)
- NDE technician (optional — enabled once a contractor is chosen)
- Inspection date (optional)
Save, and the inspection is created with status
Unreviewed.
About the inspection type
Section titled “About the inspection type”The inspection type is the NDE method the inspection records — radiographic (RT), ultrasonic (UT), visual (VT), heat treatment, and so on. It is what the NDE complete breakdown on an ISO counts, and on a radiographic type it is what tells MaxTrax to show you the radiograph log.
- The picker offers only active types. If your administrator retires a type, it stops being offered for new inspections and stops appearing as a filter on the Inspections screen.
- Inspections already recorded under a retired type keep showing their real type — on the inspection’s own detail, in the per-weld inspection list, in the weld drawer, on the ISO’s NDE complete breakdown, and on sampling coverage. Your historical record is never relabelled, and a retired radiographic type still shows its radiograph log.
- If a type genuinely cannot be found, MaxTrax says so plainly — you see a marker such as
#12 (unknown)in place of the name, never a blank and never a guessed label. On an ISO’s NDE complete sub-line the breakdown reads NDE breakdown unavailable rather than quietly disappearing, because a partial breakdown would understate the real counts.
About the NDE contractor and technician
Section titled “About the NDE contractor and technician”Both are optional, and leaving the contractor empty is itself meaningful: an inspection with no contractor is one that has not been requested yet, which is what puts it on the Ready to request lens. So MaxTrax is careful to distinguish “nobody recorded” from “recorded, but we cannot name them”.
- The pickers offer only active parties. If your administrator retires a contractor or a technician, they stop being offered on New inspection and in the Send NDE request chooser.
- Inspections already assigned to a retired party keep showing that party’s real name — on the inspection’s own detail and in the per-weld inspection list. A request you already sent will not start reading as one you never sent.
- On those two screens, a dash (
—) means nobody was recorded. It never means “we could not look them up”. - If a contractor or technician genuinely cannot be found there, you see a marker such as
#12in place of the name — including when the lookup fails to load. That marker is deliberate: something was recorded, and showing the dash instead would tell you the opposite of the truth. - Elsewhere in MaxTrax this distinction is not drawn yet. The weld drawer on the weld matrix still shows a dash for a retired technician, the same as for one that was never recorded. Read a dash there as “no technician name to show”, not as “no technician was assigned”.
Record the result
Section titled “Record the result”-
Open the inspection and select Record result.
-
The choices are named for what you found. Only the ones that are legal from the inspection’s current state are offered:
- Accept: records the exam as
Passed. - Reject — weld defect: records
Failedfor a real indication in the weld. See What happens next for what that does to the weld. - Re-examine — invalid exam: offered only on an inspection that is already
Failed. It recordsReworkedso the same joint gets re-shot. No repair weld is created and the weld’s status does not change. A weld already moved toRejectedstaysRejected, and a repair weld already created is not withdrawn. - Awaiting: records
Pending. The exam isn’t complete yet. - Void exam: records
Negated, so the exam no longer counts toward the weld.
From
Unreviewedyou can choose Accept, Reject — weld defect, Awaiting or Void exam. FromPending: Accept, Reject — weld defect or Void exam. FromFailed: Re-examine — invalid exam or Void exam. FromReworked: Accept or Reject — weld defect.PassedandNegatedare final. Once an inspection reaches one of these, no further result can be recorded against it. - Accept: records the exam as
-
Read the consequence line under your choice, then save. There’s no separate rejection-reason field. The outcome you pick is the record.
Citing the code edition you inspected under
Section titled “Citing the code edition you inspected under”Recording a result (and revising a WPS — see Welding procedures) offers an
optional Cited code edition field: search and pick the code and edition (for example, “ASME
B31.3 · 2022”) the disposition was actually made under, then optionally add a Clause / table
reference (e.g. 341.3.2). Leaving it blank is always fine — nothing is filled in for you, and
MaxTrax never guesses or defaults to “the latest edition” on your behalf.
Once saved, the citation shows as a small chip wherever that inspection appears — on the Inspections list, on the inspection’s own detail, and in a WPS’s revision history. Select the chip to open a read-only popover with the exact code, edition, and clause/table that was recorded — this is a snapshot of what was cited at the time, not a live lookup, so it stays correct even if the code register changes later. A result with nothing cited shows Uncited instead of a chip.
If you pick an edition that isn’t in the register (a leftover from a stale page, for instance), saving is refused with an inline message naming the rejected citation — your other selections (outcome, chart, tech) aren’t lost, so you can just fix the citation and save again.
Filtering the list by a cited edition
Section titled “Filtering the list by a cited edition”The Inspections list has a Cited under filter alongside its other filters: pick a code edition to show only inspections cited under it. A chip appears next to the picker showing what’s applied — select its ✕ to clear just that filter (the other filters you’ve set stay as they are).
What happens next
Section titled “What happens next”MaxTrax re-checks the weld’s inspections every time you record a result, under the project’s NDE policy for each exam type:
- If every inspection on the weld has passed, the weld becomes
Accepted. - A Reject — weld defect on a mandatory exam type makes the weld
Rejected, and a repair follows. - A Reject — weld defect on a lot-eligible exam type is recorded as a failed sample, and the
weld isn’t moved. A weld is still never
Acceptedwhile any of its active inspections isFailed.
The confirmation reports what actually happened. For example, “Reject recorded — weld Rejected; a
repair follows.” When the weld’s status didn’t move, it says “Reject recorded — the weld’s status did
not change.” This happens for a lot-eligible exam type, and also when the weld was already
Rejected. Every result you
record is kept, so the inspection history behind a weld’s current status is always there to review.
The weld’s Inspections list shows each inspection’s Disposition next to its result. It
reads Reject for a failure on a mandatory exam type and Lot-accepted for a failure on a
lot-eligible exam type that the policy tolerated as a sample. Anything else shows a dash. That
includes results recorded before dispositions were stamped. An Accepted weld is eligible to roll into its test package. See
Complete a weld & test-package sign-off.
Overriding a weld’s status directly
Section titled “Overriding a weld’s status directly”Separately from recording an inspection result, someone with edit access can change a weld’s
status directly from Welds, using its Change Status action — Accept, Reject, or
Void. This only works while the weld is still Pending, and it doesn’t create or require an
inspection — it’s a direct, manual override, distinct from the inspection flow above.
Related
Section titled “Related”- Inspector overview
- Weld status lifecycle — the full state machine behind these outcomes.
- Repair a weld
- Getting started — weld and status vocabulary.
- Welding procedures (WPS) — where a citation also shows up in a WPS’s revision history.
- Field register workflow — the same Cited code edition field in the field’s Record result sheet.