Skip to content

Operations Home

Home is the screen most people land on after signing in — the project’s work queue, not a dashboard of charts. It answers one question: what needs my attention right now?

Home needs a resolved project — if you have access to more than one, pick one from the project switcher first. Everything on the page is scoped to that project. With more than 12 projects, type part of a project’s code or name in the switcher to filter the list.

The “Work queue — what needs you now” card lists five counts, worst first:

Line What it counts Opens
NDE backlog Inspections awaiting a result or an NDE request /inspections, pre-filtered
Open rejects Rejected welds with no repair issued yet /welds, pre-filtered to Rejected
Packages awaiting signature Complete packages ready to sign Not yet linked — see note below
Validation issues Welds flagged by data validation /welds, the ⚠ Issues lens
Queued offline writes Changes on this device waiting to sync Not a saved view — see the sync indicator in the header

Each line carries an icon and a soft status chip — Action needed (red), Pending (amber), or Queued (slate) — so severity never depends on color alone. A line at zero de-escalates to a green Clear chip and sinks to the bottom of the list; everything still outstanding sorts worst first, then by whatever your active layout preset (below) emphasizes.

Below the work queue, a single stacked bar summarizes every active weld in the project — Accepted, Pending, In repair, and Open rejects — with the headline accepted percentage beside it and a count legend underneath. Voided welds are excluded from both the bar and the percentage, so voiding a weld never inflates your numbers.

Beside the project weld status band, a card reports the project’s earned Diameter Inch (DI) — the industry pipe-fabrication productivity unit (see the glossary). The headline is inches earned, credited once per made-good joint, with the percentage of the project’s eligible weld set beneath it. A short trend strip shows recent earned progress. Two smaller figures — rework (diameter-inches on repair welds) and open rejects — are shown separately and are never added into the earned total. The percentage is against the current eligible weld set, not a project plan or budget baseline. This is the same number shown on the weld matrix’s status rollup for any ISO in the project.

When none of the welds you can see counts toward diameter inches yet, the card says No eligible welds yet instead of showing 0″. That’s usually a brand-new project with nothing assigned to its ISOs, or one whose welds are all structural or of types that aren’t measured in diameter inches. Like every figure here, it covers only the welds your access lets you see — if your access is limited to certain contractors or weld types, a colleague with wider access may see progress where you see this message. As soon as an eligible weld is visible to you, even one whose pipe size hasn’t been entered, the card shows the earned inches as usual, starting from 0″.

This card needs a server connection — unlike the work queue and weld status band above it, it isn’t backed by your device’s offline data. If you’re offline, it shows a retry notice instead of a number; the rest of Home keeps working as usual.

With the QC manager layout preset (below) active, a “How are we doing” card sits directly under the diameter-inch card. It shows two quality rates over the last 30 days, each with the counts behind it and a small per-day bar chart:

Rate What it means
Right-first-time rate Of the welds whose first RT/UT review fell in the last 30 days, the share that passed that first review
RT/UT reject rate Of the RT/UT inspections reviewed (passed or failed) in the last 30 days, the share that failed

Both rates come from the same server-side definitions every MaxTrax surface uses, so a rate here always matches the same rate elsewhere. A rate with nothing to measure yet shows a dash and No reviewed RT/UT inspections in the last 30 days — never 0 %.

Open the rejected-weld lens on the reject-rate tile opens the same pre-filtered Rejected weld lens the work queue’s Open rejects line opens. The right-first-time tile has no link: whether a weld passed first time is part of its review history, which the weld grid can’t filter.

The Data as of stamp at the top of the card is when the server read the figures, shown in your time zone. The card needs a server connection — offline, it says Needs a connection and the rest of Home keeps working.

A pair of cards sits below the diameter-inch card. The first, Production today, reports the diameter inches earned today, then compares the last 7 days against the 7 days before them — as a percentage, in words, and with an arrow, so the direction never depends on color alone.

A small bar chart underneath covers a wider span than the comparison does: one column per day over the last 30 days, so you can see the shape of the month behind this week’s number. A day with no work recorded is a real zero column, not a gap, so a quiet stretch reads as a quiet stretch rather than a straight line.

Two things are worth knowing about the numbers:

  • Days are counted in UTC, matching the dates the diameter-inch ledger itself is built from. If you work well east or west of UTC, “today” rolls over at a different moment than your local midnight.
  • These figures don’t open a saved view. Diameter inch is summed on the server and no weld or inspection grid filter reproduces it, so the card says so plainly rather than sending you to a screen showing a different number.

If there’s been no earned work in either week, the card says so instead of drawing an empty chart.

The second card of the pair tracks rejects rather than progress:

Figure What it means
Rejected diameter inches The last 7 days against the 7 before, with a per-day trend strip
Top defect The reject code carrying the most rejected inches, and its share of all rejected inches
Repair rate Rework inches as a share of earned inches — for every 100″ made good, how much went back through a repair

Here a rising trend is the bad direction, the reverse of Production today — the arrow and the wording both say which way things moved. A small two-part bar shows how concentrated the rejects are: the worst code against everything else. That mix is measured over the whole project history, while the trend figures above it cover the 7-day windows — two different questions, each labelled with its own basis.

Review rejected welds at the top of the card opens the same pre-filtered Rejected weld lens the work queue’s Open rejects line opens.

If nothing has ever been rejected on the project, the card says so.

Between the analytics cards and the work queue, the “Needs a decision” card ranks the three most consequential exceptions right now. It’s a shortlist, not a second work queue: the work queue lists everything waiting on you, this picks what to deal with first.

Row Ranked on Opens
Rejects awaiting a disposition How many rejected welds have no repair issued /welds, pre-filtered to Rejected
Oldest inspection is ageing How long the oldest inspection has waited, in days /inspections, pre-filtered and sorted oldest-first
Test packages blocked by incomplete welds How many packages can’t be signed yet Not yet linked — same reason as the work queue line

Every number here is the same number the work queue above it shows for the same thing — the two cards read from one shared calculation, so they can’t disagree.

Note that the backlog row ranks on age, not size. A 200-deep queue that turns over daily needs no decision; a single request sitting for six weeks does. The number the row displays is the same age it was ranked on, and the grid it opens is sorted oldest-first, so the inspection the row is talking about is the first one you see.

Inspections with no date recorded don’t count toward that age. In the inspections grid their Date shows a dash, and a date sort always lists them last, oldest-first or newest-first. If none of the inspections awaiting a result has a date, the row reads No dated inspections awaiting a result and shows how many are waiting instead of an age.

When nothing needs a decision, the card says so rather than padding itself with resolved rows.

The segmented control in the page header — QC manager, NDT coordinator, or Foreman — is a curated choice, not a freeform layout builder. Selecting one changes two things: which work queue lines are visually promoted to the top, and which tab of the Recent panel (below) opens by default.

Preset Emphasizes Recent panel default
QC manager Validation issues, packages awaiting signature, NDE backlog — plus the How are we doing card Recent activity
NDT coordinator NDE backlog Recent activity
Foreman Open rejects, queued offline writes Jump back in

Your choice is remembered on this browser.

Administrators see an additional project-setup checklist above the work queue while any step is incomplete — it self-retires once every step reads Done. Each step deep-links to the screen that fixes it:

Step Done when
Project & policy Project settings are configured
Signing policy Report sign-off parties or approval groups are set
Reference data Weld types, inspection types, NDE contractors, and more are loaded
Welder qualifications Welders on the project have qualifications on record
ISOs imported At least one ISO exists for the project
Custom fields Project-specific custom fields have been defined
Team invited Every invited user has activated their account

A step reading Needs attention (amber) is actionable now — for example, a pending invite or an expiring welder qualification; To do (gray) means the step hasn’t been started. The checklist is collapsible, and its collapsed state is remembered per project. Non-administrators don’t see this card.

If the project has no reference data or custom fields loaded at all, Home replaces the work queue with a “Let’s get this project set up” prompt instead — select Go to Admin to begin.

A tabbed Recent panel at the bottom of the page has two tabs:

  • Jump back in — the ISOs you’ve recently opened, so you can return to one with a click.
  • Recent activity — reserved for a future project-activity feed; today it shows an honest empty state rather than fabricated activity.